Skip to content

COVID-19 SERVICES UPDATE: 10 October 2020 expiry date for extended WoFs, CoFs and driver licences confirmed. More information.

SCAM ALERT: Vehicle licence (rego) renewal phishing emails.

Access keys for nzta.govt.nz

  • h Home
  • m Menu
  • 0 Show list of access keys
  • 2 Skip to content
  • 3 Skip to top

Resources

Filter by:

Results

Sort by: Relevancy | Date | Title

Displaying Page 4 of 9

#20-03 Changes to the physical works prequalification pack

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice advises that the latest changes to the Prequalification for physical works information pack are available to assist suppliers and project managers to more easily apply the prequalification protocols. This will enable a more consistent and expedited procurement process.

#20-02 Pilot specification for in-situ subgrade stabilisation

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that the NZ Transport Agency (NZTA) Specification B/9P:2020, In-situ subgrade stabilisation, has been released for use on agreed pilot projects and is available for download from the Transport Agency’s website.

#19-06 Bridge manual, third edition, amendment 3

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This technical advice note confirms that amendment 3 to the NZ Transport Agency’s Bridge manual 3rd edition and the new Bridge manual commentary, both published in October 2018, are available on the Transport Agency’s website for download.

#19-07 Bridge manual – mechanical reinforcement couplers and anchors – interim advice (July 2019)

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This technical advice note outlines interim requirements for the use of mechanical reinforcement couplers and anchors, subsequent to the publication of the Bridge manual 3rd edition amendment 3.

#19-05 Treatment of flush and bleeding road surfaces

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice provides the guidance to assist maintenance contract managers to more easily respond to proposed works aimed at remedial works for areas of binder rise.   The guidance has been released, will come into effect from 1 April 2019 and should be applied to all resealing works in the Maintenance Renewals Programme.

#19-04 Launch of the Standard safety intervention toolkit for the Safe Networks Programme

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice advises that the draft Standard safety intervention toolkit is available to assist project managers to more easily apply the Safe Network Programme funding model.   The draft toolkit has been released, will come into effect from 14 March 2019 and should be applied to all works in the Safe Network Programme.

#19-01 Revision of the Code of Practice for Temporary Traffic Management (CoPTTM)

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice advises that there has been a general update for the Code of Practice for Temporary Traffic Management Manual, which will come into effect from February 2019 and must be applied to all work from then.

#19-02 Revision of the NZ Transport Agency Standard P45:2019 accidental archaeological discovery protocol (ADP)

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This notice advises that the procedures for managing accidental discoveries of archaeological heritage finds have been revised.   The new standard applies from February 2019 and must be used by all staff developing new physical works contracts.

#18-01 Re-organisation of the ratification process for policy, standards and guidelines documents managed by System Design & Delivery

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Roading contractors

This Technical advice note is to advise of changes to the process for ratifying policy, standards and guidelines contained in documents managed by System Design and Delivery (SDD) Group.

#17-21 ConstructSafe Tier 1 accreditation

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This technical advice note is to advise of updates to NZ Transport Agency ConstructSafe Tier 1 accreditation requirements.
Top