Skip to content

CORONAVIRUS DISEASE (COVID-19) SERVICES UPDATE: Find out about services open under Alert Level 1. Please note, we are currently experiencing higher than normal volumes of work so please be patient as our teams work at reduced capacity. More information on our services

SCAM ALERT: vehicle licence (rego) renewal or tolling payment phishing emails

Access keys for nzta.govt.nz

  • h Home
  • m Menu
  • 0 Show list of access keys
  • 2 Skip to content
  • 3 Skip to top

Resources

Filter by:

Results

Sort by: Relevancy | Date | Title

Displaying Page 3 of 8

#17-11 People, place and environment series: new Social impact guide and updated Public engagement guidelines

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The Social impact guide and Public engagement guidelines have gone through the consultation process and have now been published.  

#19-04 Launch of the Standard safety intervention toolkit for the Safe Networks Programme

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice advises that the draft Standard safety intervention toolkit is available to assist project managers to more easily apply the Safe Network Programme funding model.   The draft toolkit has been released, will come into effect from 14 March 2019 and should be applied to all works in the Safe Network Programme.

#17-05 SM021 Contract procedures manual update

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The Contract procedures manual has been updated to reflect changes to the Highways and Network Operations’ (HNO) contract procedures (part A).  

#16-07 Update to Z19 State highway environmental and social responsibility standard and guidance

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The purpose of the Z19 State highway environmental and social responsibility standard is to explain to Transport Agency project and maintenance contract managers and their teams how and when to implement the Transport Agency’s environmental and social, including urban design, requirements of any state highway work.

#15-02 SM018 Annual plan instructions 16/17

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The State highway annual plan instructions manual (SM018) has been released for 2016/17.

#17-06 Coastal effects assessment guideline released

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The Transport Agency has developed the Coastal affects assessment guideline in response to the Agency’s focus on long-term climate change impacts, such as sea level rise, increased inundation, and various environmental effects to ensure resilience of the New Zealand highway network.

#17-02 New Multi criteria analysis for transport business cases guidelines for consultation

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

A new document has been released for consultation with users/stakeholders to gain feedback on the Multi criteria analysis for transport business cases guidelines.  

#17-08 Modification to sealing using melter aggregate chip seals

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This technical advice note outlines modifications to sealing practice when using melter aggregate. This technical advice is superseded by #19-08 Release of the new M6 specification for sealing chip.  

 

#19-03 Specification for design, construction and maintenance of cycling and shared path facilities

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice advises that the procedures for managing the design, construction and maintenance of cycling and shared path facilities have been revised.   The new standard applies from February 2019 and should be used by all staff carrying out physical works in the areas identified on the state highway network facilities map.

#16-14 Stormwater specification for state highways

Published: | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The P46 State highway stormwater specification sets out the design and construction stormwater requirements for all state highway improvement projects, however a construction specification will still be necessary for construction requirements.
Top