Positive Safety Initiative - Bridge Column

november2

Overview

The Shared Path Team had the opportunity to eliminate working at height during the assembly of the super structures for the bridge columns. The assembly crew identified the opportunity to assemble the temporary super structure column frames from the ground reducing the need to work at height. The handrails, kickboards and scrim were all constructed from the ground up. Through careful planning and discussion, the crew completed this assemble eliminating risk of working at height and created a better ergonomic position for the crew to work from.