Skip to content

Access keys for nzta.govt.nz

  • h Home
  • m Menu
  • 0 Show list of access keys
  • 2 Skip to content
  • 3 Skip to top

Positive Safety Initiative - Waterview Hydro Excavation Box

Capture2

Overview

The hydro demolition works on Oakley Creek Bridge used high pressure water at 32K psi to break out sections of the concrete deck. This was a high risk activity that has the potential to shoot concrete debris into both people and plant. In order to screen the works one of our team made up a ply box with a roof for the hydro demolition gun operator to work within.

Top